A worked example from the authors’ paper. The stated outputs depend on batch volume, drying schedule and fuel quality. Equipment and operating parameters must be confirmed for each project.

Complex configuration

The paper considers three chambers: two SK-136 units at 50 m³ each and one SK-272 at 100 m³. The total of 200 m³ refers to the assumed batch volume. Actual capacity depends on board thickness, pack dimensions and spacers.

SK chamber with front loading — illustration from the paper.
SK chamber with front loading — illustration from the paper.

Insulation and energy use

The authors compare rigid polyurethane foam and mineral wool by thermal conductivity and resistance to water-vapour diffusion. Insulation thickness and moisture, enclosure sealing and thermal bridges all affect the selection. For 40 mm pine boards and fuel moisture of 40%, the example assumes 3.0 kW/m³ for a polyurethane-insulated chamber and 4.5 kW/m³ for a mineral-wool-insulated chamber.

Drying schedules for 25 and 50 mm pine boards — graph from the original paper.
Drying schedules for 25 and 50 mm pine boards — graph from the original paper.

Boiler output calculation

With all three chambers operating simultaneously, the authors calculate 600 kW for polyurethane insulation and 900 kW for mineral wool. For fuel moisture of approximately 60%, the paper adds 30% to the required rated output. Staggered chamber operation reduces peak demand by 20% in this example.

Scenario in the paperRigid polyurethaneMineral wool
Fuel up to 40% moisture, simultaneous operation600 kW900 kW
Fuel around 60% moisture, simultaneous operation780 kW1170 kW
Fuel up to 40% moisture, staggered operation480 kW—
Fuel around 60% moisture, staggered operation624 kW—

The proposed 600 kW plant does not automatically cover every scenario in the table. Wet-fuel scenarios requiring 624–780 kW need a separate review of rated output and chamber scheduling.

Chamber specifications

Parameters from the original specification
ParameterSK-136SK-272
Number of chambers in the complex21
Capacity with 40 mm boards50 m³100 m³
Capacity with 25 mm boards41 m³80 m³
Capacity with 50 mm boards53 m³115 m³
External dimensions, W × D × H6,73 × 7,24 × 5,6 m13,23 × 7,24 × 5,6 m
Installed electrical power13,1 kW26,2 kW
Maximum boiler thermal output per chamber185 kW370 kW
Number of fans48
Wall / roof thickness100 / 140 mm100 / 140 mm
ControlsAS-200AS-200

The chamber specification lists 185 and 370 kW. These use different design conditions from the 150 and 300 kW drying example. Heating and drying schedules must be confirmed when selecting equipment.

Boiler plant and fuel handling

The specification lists a KWH-600 boiler, an AZSD-500/RR combustion unit with moving grates and automatic ash removal, EcoControl controls, an HWP-40/2 hydraulic fuel extractor, a ZPU screw conveyor and a B-600 multicyclone with a WWOax-25 induced-draught fan. The example provides storage for 100 m³ of loose fuel.

KWH boiler construction — diagram from the paper.
KWH boiler construction — diagram from the paper.
AZSD unit with moving grates — diagram from the paper.
AZSD unit with moving grates — diagram from the paper.

The authors select HAMECH SK chambers with a KWH + AZSD heat source. For a particular site, confirm timber species and thickness, initial and final moisture, chamber loading schedules and fuel properties.

Full original paper

This web version presents the main calculations and equipment package. The original DOC includes the full text, graphs, technical explanations and specification.