
- Output / batch
- 4 000 кВт
- Equipment
- KWH-2000×2
AZSD-1000×4 - Year
- 2007–2009
- Location
- Плещеницы
The new boiler plant No. 2 in Pleshchenitsy was built for local woody fuels: chips and sawdust.
The documented equipment package includes two KWH-2000 boilers and four AZSD-1000 combustion systems. The plant was commissioned in 2009.

